13F, Orange Planet Bldg., 217, Teheran-ro, Gangnam-gu, Korea webmaster@ltsambo.co.kr
 Contact us  Sinagpore  KOREAN
LT SAMBO
  • HOME
  • Company
    • CEO Greetings
    • Management Philosophy
    • Vision
    • Management Policy
    • Management System
    • Company History
    • Contact us
  • Business
    • Diaphragm Wall
    • Cast-In-Place Pile
    • Marine Work
    • Tunnel
    • Road/Railway Work
    • Plant Civil Enabling Works
    • Earth Work/ Ground Improvement
    • Architecture
    • Institute of Technology
  • Accomplishment
    • Yearly accomplishment
  • HR Recruitment
    • Recruitment Information
    • Recruitment Q&A
  • PR Center
    • LT SAMBO NEWS
    • PR DATA
    • Clients Registration
    • Global network
    • Affiliates
  • Customer Center
    • Q&A
    • Cyber appeal

 Contact us

 Sinagpore

 KOREAN

LT SAMBO
    • Current Page
  1. Home
  2. Business
  3. Tunnel
  4. Business Introduction
Tunnel
  • Business Introduction
  • Owned equipment

As the development of industry, economic growth, and expansion of urban scale are accelerated, efforts to utilize tunnels and underground spaces are increasing due to efficient utilization of the land and environmental conservation. Due to urbanization, the increase in the number of vehicles and population has caused serious traffic problems due to lack of public transportation facilities. Therefore, construction of tunnels in urban areas has been steadily increasing as a solution for such traffic problems.

Usage
  • Transportation of roads, railways and subways
  • Water supply and drainage
  • Transportation and underground storage of oil
삼보E&C
삼보E&C
Type of construction method

Shield TBM method

Introduction

In this method, a cylindrical steel excavating machine with a sharp edge(Shield) is press-fitted into the tunnel face, The tunnel is constructed by digging the inside of the cylinder, supporting the excavation equipment to the wall and segments of the tunnel, moving the cylinder forward, and completing the segment lining behind the shield machine.

characteristics
  • Developed by a tunnel method in aquifer ground such as rivers and sea.
  • Compared to NATM and Open TBM, excavation and simultaneous lining are installed,
    thus shortening construction period.
  • Widely used recently in urban tunnel construction
  • High resistance to external stress due to high arch forming effect on circular cross section
  • Simple construction management makes quality control easy
  • Minimal manpower is used to reduce safety accidents

The need, experience & level of technology for mechanical excavation(Shield TBM)

Compared to the tunneling method focused on the blasting method, the environmental damage such as noise and vibration can be minimized and High-speed construction in long tunnels can greatly reduce construction cost and construction time. and, In particular, mechanical excavation method is needed because it is considered to be the best tunneling method for improvement of environmental performance, stability and economical efficiency in urban areas.

Accomplishment
pageview
View

Seoul Jemulpo-Ro Underground Tunnel

Tunnel
  • Korea
  • 2016
  • Construction period
  • 2016.02 ~ 2021.04
  • The Employer/ Client
  • Seoul Tunnel
  • The Main Contractor
  • Hyundai E&C
  • Project outline
  • Road Tunnel
pageview
View

TBM Operation at Bored Tunnel of DTL3 C925

Tunnel
  • Singapore
  • 2013
  • Construction period
  • 2013.06 ~ 2015.03
  • The Employer/ Client
  • LTA
  • The Main Contractor
  • GS E&C
  • Project outline
  • TBM Tunnel Works
pageview
View

High Speed Railway - Suseo~Pyungtac #3-2

Tunnel
  • Korea
  • 2012
  • Construction period
  • 2012.07 ~ 2017.11
  • The Employer/ Client
  • Korea Rail Network Authority(KTX)
  • The Main Contractor
  • GS E&C
  • Project outline
  • Civil
pageview
View

Banghak-dobong Electric Power shaft

Tunnel
  • Korea
  • 2009
  • Construction period
  • 2009.06 ~ 2011.08
  • The Employer/ Client
  • Korea Electric Power Corp.
  • The Main Contractor
  • GS E&C
  • Project outline
  • Civil
View All
  • assessmentLT SAMBO NEWS
  • ● Order announcement(New construction of an apartment in Myeongi-area, Korea)


    1. Project : New construction of an apartment in Myeongi-area

    2. Client : YOUSEUNG Corp. + Daeyoon D&C

    3. Main Contractor : Shinsegae Engineering & Construction Co., Ltd.

    4. Construction Feature : Earthwork and so on.
    alarm Mar 24, 2023

    View all
  • videocamVideo Profile
  • ● Three-Runway System


    LT 삼보
    alarm Jul 6, 2017

    View all
  
LT SAMBO
Latest News
  • Order announcement(New construction of an apartment in Myeongi-area, Korea)
  • Order announcement(Godeok Xi centro Constructions, Korea)
  • Order announcement(C3804 - East Fire Station, HONGKONG)
  • Order announcement(e-Convenient City Pyeongtaek Goduk, Korea)
  • Order announcement(Reclamation and site construction of offshore port lighters wharf(Korea)
Contact Us
  • 13F, Orange Planet Bldg., 217, Teheran-ro, Gangnam-gu, Seoul, Republic of Korea
  • 02-3480-9500
  • 02--532-0577
  • webmaster@ltsambo.co.kr
    • LT Metal Ltd
    • LT Precision Ltd
    • LT Material Ltd

SITE MAP
© Copyright 2017 - LT SAMBO
All right reserved